Portal de Alcantarilla

www.portaldealcantarilla.com

Alcantarilla - SpanishAlcantarilla - English
detail of Alcantarilla

 

The House approved the final draft of the management to carry out works on the outer surface of the underground parking in the area of Entrevías (12/02/2009)

In the morning the plenary session of the Municipal Corporation approved the basic design and implementation for the new management Entrevías square in our town, drawn by architect Juan Antonio Molina Murcia, amounting to four billion euros.

The plenum also approved the maximum amount of general facilities, both underground car park is in an advanced stage of implementation.

For the Municipal People's Party spokesman, Juan José Gómez, "This is a flagship project for Sewer and hope that it can be ready for this spring, giving the residents of this town of a major leisure and recreation, as hope that it is an engine that drives economic recovery, commercial and business area and around the town, especially in such critical times through which it passes our economy. "

Popular spokesman refused to clarify the economic data set for the new project for the management of the plaza outside Entrevías and modifications of the contract for construction and operation of underground parking, noting that "after the various improvements and adjustments, this project created initially at a cost of 7,486,793 euros, will now be 8,489,588 euros for the underground floors of parking, while for the outer space of the plaza, originally planned 1,985,635 euros, following the changes and improvements made in it happens to have a final cost of 4,002,000 euros. "

He also said he was "disappointed with the figures given to the media by opposition groups, which indicated an increase in this important project by six million euros, when in reality the final project in terms of construction increases, increased parking spaces and improvements in the project outside the square is 3,019,159 euros.

We face a noteworthy project and take account of its construction, as well as in the environmental field, looking at plants and trees, with open areas, with natural ventilation, much greener than if evacuation of gases had to be mechanical ventilation. "

The proposed amendment also provides for all these changes and improvements to the building of 107 new parking spaces, from the previous 401 to 508 parking spaces down, with a total of 352 seats, 69% for residents and a total of 152 parking spaces, 30% for rotation.

And a total of 4 seats for the use of city vehicles.

The Deputy Mayor of Finance and popular spokesman, said such data importantote "the new total fee that is set in the grant to pay the City, from the 82.000euros to have been finally approved 241,307 euros, having a 40-year concession plus 20 years of dealership UTE extending the management of these car parks. "

Source: Ayuntamiento de Alcantarilla

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información