Portal de Alcantarilla

www.portaldealcantarilla.com

Alcantarilla - SpanishAlcantarilla - English
detail of Alcantarilla

 

Development rehabilitate the road linking the Way of the soldiers, with the Industrial West and the Las Tejeras (28/10/2015)

The Minister of Public Works and Infrastructures, Francisco Barnabas and Sewer Mayor, Joaquín Buendía, accompanied by the Director General of Roads, Jose Antonio Fernandez, along with the Town Planning, Construction and Services, Laura Sandoval and other members of the Municipal Corporation , have conducted a technical visit to the rehabilitation of the RM-E29 highway that connects the Way of Soldiers (road connecting with El Palmar Sewer) and Industrial West, as well as the Las Tejeras.

Barnabas stressed the importance of the road, "whose course of 1.8 kilometers linking the two towns of Murcia and Sewer and means for their closeness, direct connection to the busy industrial area west leading to it a way both light and heavy, with more than 1,000 vehicles per day on average. "

The holder of Development stressed that "this is a very necessary work, which involves an investment of 110,578 euros and aims to increase security and facilitate the mobility of residents of the area, because the progressive wear firm because of high traffic since mostly runs through the garden. "

The work, which will be implemented in a very short time, it is expected that by the end of next week and is fully executed, is the strengthening of the pavement of the RM-E29 road linking the two towns whose origin is at the intersection with the RM-E4 highway and ends at the intersection with the Aviation street in the neighborhood of Las Tejeras and access to the West Industrial Park in Sewell.

To do so, the Minister Francisco Barnabas explained that "have started the cleaning and reconstruction of ditches, berms and walks and continue with the previous repair torches, stabilize the subsidence of the road and the pavement milling cracked in fine mesh zones ".

Sewer Mayor Joaquin Buendia, thanked the speed and compliance with the deadlines set by Barnabas Director in his previous visit to Sewell, running these major rehabilitation of the pavement of the RM-E29 road, connecting from the road Soldiers (road connecting with El Palmar Sewer), next to the freight station and the West Industrial Park Sewer, running along the familiar landscape of the Black Voice, to finish it at the junction with the street Aviation, and in The neighborhood Tejeras.

Important especially as an important escape route vehicle when the municipality is collapsed parties, sporting events, etc.

But especially to communicate an important part of Sewer and districts of Murcia on our industrial park. "

Regularization with a layer of hot asphalt mix will also be needed and, finally, proceed to strengthen the firm with a layer of hot asphalt mix.

Work also includes the replacement of vertical signaling and marking elements, as well as painting the existing road markings, both longitudinal and lateral axis lines as cebreados, and the installation of a safety barrier in the existing canal in the right bank.

Source: Ayuntamiento de Alcantarilla

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información