Following the publication in yesterday in the Government Gazette, the notice of the Directorate General of Railways, Ministry of Development, which is subjected to public inquiry, the "Information Study of High Speed ​​Connection Murcia -Cartagena ", and considering the ad that is undertaken by the Ministry of Development, that after analysis and comparison, proposed as a convenient alternative to the East, which basically runs along the line between Murcia and Cartagena, on Balsicas .
Mayor Sewell, Lazarus Mellado, expressed "satisfaction, because for the first time in a study reported, as well as the statements made by the Ministry of Development, sets out the various arguments that have been presented since 2000 by our City Council, following our proposals, both for the integration of the railway projects in the city of Murcia, and for high speed lines passing through Sewer, especially the Murcia-Almeria, and the link now comes to public information. positive rating, as is clear from the information we currently have. For the first time, we see written down the integration of the railway as it passes through the village of Las Tejeras. Now we will study it carefully and present the allegations or make any comments we deem beneficial to Sewer. "
Sewer Mayor also said "welcome the fact that this study reported, consider the links with the future paths of Alternative Railroad as it passes through our city. Moreover, to the current process of the season, the level crossing of Main Street, stated that in the future will be dismantled. "
Now, as the Mayor of Sewell, Lazarus Mellado, "we have to continue to urge the urgent need for the Alternative Railroad Culvert passing through, to run as soon as possible, as well as we revealed yesterday in Murcia as the Chief Public Works and Planning, Antonio Sevilla and me in our meeting in the Ministry, together with Director General of Transport, confirming the mutual interest of both institutions to carry out the planned action protocol with the Ministry Development, especially in the interest of the two projects together and walk the solution to the problem of rail Sewer and especially in the neighborhood of Las Tejeras is fixed according to our proposals and our forecasts. We are currently awaiting a next meeting in Madrid in the Directorate General of Railways, in which we present the three governments to address the same. "
Source: Ayuntamiento de Alcantarilla