Following the meeting held last June21 with the Secretary of State for Infrastructure, Transport and Housing, Ministry of Public Works, Julio Gómez-Pomar, Alcantarilla Mayor Joaquín Buendía met last Wednesday in Madrid with Juan Bravo, president of ADIF, after making a brief presentation of the municipality, convey the concern, together with the maximum interest, of the whole municipality for finding the best solution to the integration of the rail network in the city of Alcantarilla.
On the one hand, the Mayor transferred the need to resume the necessary paperwork and work to address the construction of the Cartagena-Chinchilla Line, that of Madrid, which would lead to the disappearance of the historic road that divides Alcantarilla in two, On our main street.
The president of ADIF showed his commitment to relaunch that project that needs a new study of environmental impact and the drafting of the construction project.
On the other hand, when the modification of the Murcia-Lorca line through the Voz Negra and Las Tejeras neighborhood, ADIF continues to work on possibilities and formulas for the better integration of the line as it passes through the urban center , And the three Administrations, state, regional and local, will be placed in the next meetings.
Source: Ayuntamiento de Alcantarilla