| The works consist of removing architectural barriers, replacing paving tiles with paving stones, renovating lighting and improving of the supply and sanitation network | The Alcantarilla City Council will renew the supply and lighting network, and improve accessibility to Gloria Pastor, Teruel, Composer Albéniz, Ceuta and Cádiz streets."The works consist of the complete renovation of the lighting of these streets, the luminaires of the facades will be eliminated and columns of eight meters high will be installed.
The sidewalks will also be adapted to the accessibility law and the architectural barriers will be eliminated creating accessible routes with a minimum of 1.5 meters wide.
On the pavements, the tile will be replaced by cobblestones, "said the Councilor for Development of the City and Historical Heritage, Laura Sandoval.The burial of the low-voltage aerial network that runs from Calle Carmen to Calle Teruel is planned, and the elimination of the aerial wiring that runs along the facades.Improvement works will also be carried out in the supply and sanitation network of these streets through their meshing and the installation of new ductile iron pipes, which will replace the old fiber cement sections.The works have a budget of 382,500 euros and have a completion period of 3 months.The financing is part of the 931,800 euro fund to make investments in the streets of Alcantarilla, included in the extension of the supply and drinking water service contract, until 2025, with the company Hidrogea, approved in plenary session in September 2019.
Source: Ayuntamiento de Alcantarilla