Portal de Alcantarilla

www.portaldealcantarilla.com

Alcantarilla - SpanishAlcantarilla - English
detail of Alcantarilla

 

The Sewer City Council approves the hiring of Energy Services in the public lighting of the municipality with a saving of more than 270,000 euros per year (23/11/2018)

The City of Alcantarilla has agreed after the tender carried out- the contracting of the Energy Services provision in the outdoor public lighting installations of our municipality for the change to Led technology of all the existing lampposts in the municipality and that will allow save almost 3 million euros to the residents of Sewer during the 10 years of contract.

With the hiring, which today the Plenary of the municipal corporation has approved, will convert to LED technology more than 8,300 luminaries of our municipality and the Western Industrial Estate, with an investment of almost 4 million euros, assuming a significant reduction in consumption energy, encrypted by 73%, with the consequent economic savings and the reduction of tons of CO2 emissions to the atmosphere thus contributing to the improvement of the environment.

The complete renovation of all existing outdoor lighting installations, by new and modern facilities, will meet the new demands in energy efficiency, using lighting systems with LED technology and remote management that will also allow remote control with a computer computer or mobile device the level of illumination or the detection of blackouts or failures in the lamps, resulting in much more efficient and environmentally friendly installations.

These new lamps also have nodes to interconnect video surveillance cameras, air quality sensors, to control traffic or parking, or irrigation needs in our gardens;

in short, a wide range of new utilities with which to improve municipal services.

In addition to these new features, the new contract entails the improvement of air conditioning, lighting and the thermal envelope of the Town Hall.

The mayor of Alcantarilla, Joaquín Buendía, has deeply regretted "the time that this municipality has lost with the suspension of the hiring procedure after the appeal filed by the councilors of this city council, which has delayed the award and the beginning of savings in 15 months energy and economic estimated in more than 340,000 euros in that period ".

Source: Ayuntamiento de Alcantarilla

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información